Excellent 4.5 out of 5 Trustpilot rating

Parking Survey Services

At Focus 360 Energy, we provide detailed parking stress surveys to support planning applications, transport assessments and development proposals. Our surveys monitor on-street and off-street parking capacity, identifying availability, saturation levels and demand patterns to inform planning decisions with clear, evidence-based reporting.

What are Parking Stress Surveys?

Parking stress surveys measure the availability, demand and utilisation of parking spaces within a defined study area. They record how much parking is occupied at peak and non-peak times, helping determine whether local infrastructure can support new development, change of use or increased occupancy.

What a Parking Survey Assesses

  • On-street and off-street parking occupancy
  • Resident and visitor parking distribution
  • Peak hour stress and pressure points
  • Permit, restricted and timed parking availability
  • Overflow and displacement impact

Parking stress surveys are often required by councils to validate planning submissions and to demonstrate existing capacity or constraints.

Circular Economy Statement

Why Parking Stress Surveys Matter

  • Evidence-Based Planning SupportAccurate data strengthens planning applications and reduces the risk of objection.
  • Infrastructure Impact Assessment – Surveys highlight whether local parking stock can support new development.
  • Compliance with Local Authority Requirements- Many councils require stress surveys as part of a planning submission.
  • Reduced Appeal and Objection Risk- Clear data prevents speculation, improving approval certainty.
  • Supports Parking Design and Mitigation Strategy – Findings inform whether additional parking, restrictions, or travel planning measures are required.

The Basics of Parking Survey Methodology

Parking stress surveys are typically conducted during weekday evenings and weekends when demand is highest. Each vehicle parked within the survey area is counted, mapped and categorised, producing a clear view of capacity and stress levels.

Standard Survey Outputs

  • Beat survey parking counts
  • Graphs of occupancy vs capacity
  • Peak hour utilisation reporting
  • Stress threshold assessment (e.g. >85 percent occupancy)
  • Mapped parking distribution diagrams

The Role of Parking Surveys in Planning

Parking surveys play a crucial role in the planning process, particularly when putting forward proposals for residential, commercial, mixed-use or change-of-use developments. Local planning authorities increasingly require robust, data-driven evidence to understand how a new development will interact with existing parking conditions. A well-conducted parking stress survey provides this evidence, ensuring that proposals are supported by accurate, defensible information.

Circular Economy Statement

Related Services:

Parking Surveys are frequently combined with the following additional services:

Planning Feasibility Report

Find out more

Energy Statements for Planning Applications

Find out more

Sustainability Statements

Find out more

Noise Impact Assessment

Find out more

Flood Risk Assessment

Find out more

Land Contamination Report

Find out more

Our Process

1
Scope Definition and Study Zone Mapping
Survey extents and required reporting outputs are confirmed.
2
On-Site Data Collection
Parking occupancy is recorded across multiple timed beats at peak and non-peak periods.
3
Data Analysis and Stress Calculation
Results are assessed against local parking thresholds and stress indicators.
4
Reporting and Mapping
A complete report is produced including occupancy tables, charts and street-by-street breakdowns.
5
Submission Support
We supply planning-ready survey documents suitable for council submission, appeal or supporting evidence.

Ready to Proceed with a Parking Stress Survey?

Contact us to book a parking stress survey and receive planning-ready documentation backed by verified street-level data.

Click the Get a Quote link to access our online portal, or use the form to share brief details about your project and we will respond promptly.

Why choose Focus 360 Energy

Specialists in Parking Stress Surveys – We deliver data-driven analysis suitable for planning and transport justification.

Planning-Standard Documentation – Reports are formatted to local authority requirements and guidance.

Clear Visual Reporting – Findings are presented with maps, charts and capacity breakdowns for clarity.

Suitable for All Development Types – Residential, commercial, schools, retail and mixed-use schemes supported.

Fast Turnaround and Reliable Field Data – Efficient surveying and clear reporting minimise planning delays.

Frequently Asked Questions

Open All

Occupancy counts, capacity analysis, peak period assessment, mapping and recommendations.

Typically for developments where additional parking demand will be generated.

Yes. We follow industry-standard survey time periods for accurate peak stress capture.

Yes. Parking stress surveys provide evidence required by planning authorities to determine feasibility.

We can survey single streets, defined clusters or full neighbourhood zones depending on project scope.

GET A QUOTE
WhatsApp Icon